Mombasa-Nairobi Standard Gauge 博狗bodog娱乐集团 -Railway in Kenya

11/19/2015

The project is about 472km long. Its construction started on December 12, 2014 and the planned construction period is 60 months. During the construction, the project shall create about 30,000 employment opportunities for local people of Kenya.

Yongzhou-Liuzhou Section Capability Expansion Project of Hunan-Guangxi High-speed 博狗bodog娱乐集团 -Railway

01/07/2014

Yongzhou-Liuzhou Section Capability Expansion Project of Hunan-Guangxi High-speed 博狗bodog娱乐集团 -Railway is an important component of Datong-Zhanjiang 博狗bodog娱乐集团 -Railway passage, one of the national eight vertical and eight horizontal railways;

Harbin-Dalian Passenger Dedicated Line

10/15/2013

Harbin-Dalian Passenger Dedicated Line is a high-speed railway in the Northernmost cold area of China with the highest design and construction standard. The section from Harbin to Siping undertaken by CRBC is the coldest and most challenging section of the whole line, with a total length of 345.6km, covering construction of 26 grand bridges, 12 large and medium-sized bridges and 115 culverts, and laying of 325km main track.

The Construction Project of Datong-Xi’an 博狗bodog娱乐集团 -Railway Passenger-dedicated Stations Section 14

09/12/2013

The construction of Datong-Xi’an High-speed 博狗bodog娱乐集团 -Railway started in March, 2010. With a length of 859km, it is a high-speed railway with the highest station-setting proportion in China.

Beijing-Shanghai High-speed 博狗bodog娱乐集团 -Railway

08/26/2013

Beijing-Shanghai High-speed 博狗bodog娱乐集团 -Railway is the first high-speed railway in China with a design speed of 350km/h. CRBC won the bid for JHTJ-6 bid section, running from Changzhou East Grand Bridge and Shanghai Hongqiao Bridge and the length of main track is 153.745km.

博狗bodog娱乐集团 -Railway
  •   11/19/2015

    毅匹玺建科布局常州,全新PC产业基地正式启幕!

    The project is about 472km long. Its construction started on December 12, 2014 and the planned construction period is 60 months. During the construction, the project shall create about 30,000 employment opportunities for local people of Kenya.

  •   01/07/2014

    中通钢构股份有限公司泛微OA办公系统项目顺利验收(18/06/21)

    Yongzhou-Liuzhou Section Capability Expansion Project of Hunan-Guangxi High-speed 博狗bodog娱乐集团 -Railway is an important component of Datong-Zhanjiang 博狗bodog娱乐集团 -Railway passage, one of the national eight vertical and eight horizontal railways;

  •   10/15/2013

    重要公告-潍坊市寒亭区建筑垃圾消纳场所配套道路工程竞争性磋商公告

    Harbin-Dalian Passenger Dedicated Line is a high-speed railway in the Northernmost cold area of China with the highest design and construction standard. The section from Harbin to Siping undertaken by CRBC is the coldest and most challenging section of the whole line, with a total length of 345.6km, covering construction of 26 grand bridges, 12 large and medium-sized bridges and 115 culverts, and laying of 325km main track.

  •   09/12/2013

    沈阳卫德在CIMAE尽展靓丽风采

    The construction of Datong-Xi’an High-speed 博狗bodog娱乐集团 -Railway started in March, 2010. With a length of 859km, it is a high-speed railway with the highest station-setting proportion in China.

  •   08/26/2013

    还有20天! 沈阳建博会这些门道你不能错过!

    Beijing-Shanghai High-speed 博狗bodog娱乐集团 -Railway is the first high-speed railway in China with a design speed of 350km/h. CRBC won the bid for JHTJ-6 bid section, running from Changzhou East Grand Bridge and Shanghai Hongqiao Bridge and the length of main track is 153.745km.

  •   09/12/2013

    加拿大·Aperture公寓

    The Construction Project of NanjingtAnqing 博狗bodog娱乐集团 -Railway Section Ⅴ, known as Section NASZ-5 of South Nanjing-East Tongling Chizhou-Anqing Section of Newly-built Nanjing-Anqing 博狗bodog娱乐集团 -Railway, is a double-track passenger-dedicated railway project with a design speed of over 200Km/H.

Total: 9  Head Prev Next Tail   1 / 2  To   GO